Uncertainty quantification¶
solid pillar 8 · Data management, statistics and UQ
In one minute
- Separate aleatory (irreducible randomness) from epistemic (ignorance, reducible with effort). They demand different responses and are routinely conflated.
- Monte Carlo converges at \(1/\sqrt{N}\) regardless of dimension — slow, but the only method immune to the curse of dimensionality.
- Polynomial chaos and stochastic collocation are far faster in low dimensions and collapse above roughly 10–20 inputs.
- Global sensitivity (Sobol) apportions output variance across inputs; local derivatives answer a different and usually less interesting question.
- Numerical error is not uncertainty. Verify first, then quantify — UQ on an unconverged solution measures the mesh.
Key results¶
Two kinds of uncertainty:
| Aleatory | Epistemic | |
|---|---|---|
| Source | inherent variability | lack of knowledge |
| Examples | turbulent fluctuation, manufacturing tolerance, gust | model form, unmeasured coefficient, closure choice |
| Reducible? | no | yes, with data or better models |
| Represented as | probability distribution | interval, or distribution over models |
Monte Carlo. For \(N\) samples of a quantity with variance \(\sigma^2\):
Independent of input dimension — the reason it survives in high dimensions. Latin hypercube improves stratification for the same \(N\); quasi-Monte Carlo (Sobol sequences) can approach \(1/N\) for smooth low-dimensional integrands.
Polynomial chaos expansion. Expand the output in orthogonal polynomials of the input random variables:
For \(n\) inputs at order \(p\). With \(n=5, p=3\) that is 56 terms; with \(n=20, p=3\) it is 1771 — the curse of dimensionality in one formula. Mean and variance come free from the coefficients: \(\mathbb{E}[u] = c_0\), \(\mathrm{Var}[u] = \sum_{i\ge1} c_i^2 \langle\Psi_i^2\rangle\).
Sobol sensitivity indices. Decompose the output variance:
\(S_{Ti} - S_i\) measures how much of input \(i\)'s influence comes through interactions. \(S_{Ti}\approx0\) means the input can be fixed and removed — the most valuable practical output of a UQ study.
Gaussian process surrogate. With kernel \(k\), the posterior at a new point is
The variance term is what makes GPs the standard emulator: they report their own ignorance, which drives adaptive sampling and Bayesian optimization.
Calibration. Inferring model parameters from data, typically via Bayes. The honest version (Kennedy & O'Hagan) includes a model discrepancy term; without it, calibration absorbs structural model error into physical parameters and produces a well-fitting model with unphysical constants.
Mental model¶
Think of the simulation as a function from inputs to outputs, and UQ as characterising that function's response to input spread. Three questions, in increasing cost: how wide is the output distribution (forward propagation), which inputs drive that width (sensitivity), and what do observations tell me about the inputs (inverse/calibration).
Sampling methods treat the simulation as a black box and pay in evaluations. Surrogate methods build a cheap approximation first and pay in setup and in the risk that the surrogate is wrong somewhere you did not sample.
Numerics / practice¶
- Verify before quantifying. Grid-convergence and iterative-convergence errors must be smaller than the uncertainty you claim to measure, or you are quantifying discretization.
- Screen first. Morris screening or a coarse Sobol study cheaply identifies the two or three inputs that matter, making a full study affordable.
- Report convergence of the UQ itself. Monte Carlo estimates need their own error bars; a 100-sample mean has a visible standard error.
- Check the surrogate out of sample, and never trust it outside the convex hull of the training points.
Failure modes
Numerical error mistaken for uncertainty. Running a UQ study on a mesh that is not grid-converged produces an output spread dominated by discretization error, presented as physical uncertainty. Diagnostic: repeat the study on a finer mesh — if the "uncertainty" moves, it was never uncertainty.
Monte Carlo convergence misjudged. \(1/\sqrt{N}\) is slow: going from 10% to 1% error needs 100× the samples. Studies are routinely stopped at a few hundred samples with the standard error unreported, and conclusions drawn from noise.
PCE in too many dimensions. The term count grows combinatorially. Beyond ~10–20 inputs a full-tensor or total-order expansion is unaffordable, and truncating it silently discards interactions. Symptom: an expansion that fits the training points and fails out of sample.
GP extrapolation trusted. Outside the training data a GP reverts to the prior mean with wide variance — which is honest, provided you look at the variance. The failure is reading only \(\mu_*\). Always plot the predictive interval.
Calibration absorbing model error. Fitting a turbulence constant to match one experiment gives a model that reproduces that experiment and generalises worse than before. Symptom: "calibrated" constants far outside their physically plausible range. Include a discrepancy term, or validate on held-out conditions.
Correlated inputs sampled independently. Sobol indices and most sampling schemes assume independent inputs. Sampling correlated parameters independently generates physically impossible combinations, and the resulting variance decomposition is not interpretable.
Epistemic uncertainty forced into a probability distribution. Assigning a uniform prior to an unknown model form makes ignorance look like quantified randomness. Interval or scenario-based treatment is often more honest.
Worked example¶
Monte Carlo's price, and why screening comes first:
import numpy as np
rng = np.random.default_rng(1)
sigma = 1.0
for N in (100, 1_000, 10_000, 100_000):
est = rng.normal(0, sigma, N).mean()
se = sigma / np.sqrt(N)
print(f"N={N:7d} estimate={est:+.4f} SE={se:.4f} 95% CI half-width={1.96*se:.4f}")
N= 100 estimate=-0.0736 SE=0.1000 95% CI half-width=0.1960
N= 1000 estimate=-0.0599 SE=0.0316 95% CI half-width=0.0620
N= 10000 estimate=-0.0084 SE=0.0100 95% CI half-width=0.0196
N= 100000 estimate=-0.0029 SE=0.0032 95% CI half-width=0.0062
Three orders of magnitude in samples buy one and a half orders in accuracy. If each sample is a CFD run, this is the entire argument for surrogates and for screening inputs before sampling them.
Connections¶
- Probability and statistics — estimators and the \(1/\sqrt{n}\) ceiling.
- Verification and validation — must come first.
- Optimization and adjoints — cheap gradients for sensitivity.
- Scientific ML — surrogates and emulators at scale.
Sources¶
- Smith, Uncertainty Quantification: Theory, Implementation, and Applications.
- Saltelli et al., Global Sensitivity Analysis: The Primer — Sobol indices.
- Kennedy & O'Hagan (2001), Bayesian calibration of computer models.
- Rasmussen & Williams, Gaussian Processes for Machine Learning.